Current Affairs-Topics

Manyachiwadi: First ‘Solar Village’ of Maharashtra

Maharashtra's first 'Solar Village', Manyachiwadi, has installed 102 rooftop solar connections, providing zero-amount electricity to its 420-person population.

Manyachiwadi: Maharashtra's First Solar Village

  • Manyachiwadi in Satara district became Mah arashtra's first 'Solar Village'
  • Inaugurated by Chief Minister Eknath Shinde on August 18, 2024
  • 102 rooftop solar connections installed, covering all households
  • Population of 420 now enjoys zero-amount electricity bills
  • Public infrastructure, including street lights, water supply, school, gram panchayat office, and flour mill, powered by solar energy
  • Residents can earn extra income by selling surplus solar energy to MSEDCL

Solar Village Scheme and Government Initiatives

  • Aims to power 100 villages with 100% solar energy
  • Two villages in each district to receive up to 100% solar-powered electricity
  • Part of the larger PM Surya Ghar: Muft Bijli Yojana
  • Maharashtra State Electricity Distribution Company (MSEDCL) to implement the scheme
  • Over 70 villages across Maharashtra to join the project
  • Future projects include Shivtirth Nagar in Kothrud and Sector 25 in Nigdi
  • State government provides 90-95% subsidy to farmers for solar pump sets under Mukhyamantri Saur Krushi Pump Yojana

Goals and Benefits of Solar Village Scheme

  • Promote renewable energy and reduce dependency on traditional power sources
  • Provide free electricity to households under PM Suryagarh Muft Bijali Yojana
  • Offer free power to farmers, especially during peak agricultural activity times
  • Reduce electricity costs for residents
  • Generate 12,000 MW of electricity through solar energy in the next 1.5 years
  • Support India's renewable energy goals
  • Boost local economies and improve quality of life in rural areas

National Context and Challenges

  • Ministry of New and Renewable Energy (MNRE) launched guidelines for model solar villages
  • Approximately Rs 800 crore allocated for the national project
  • Each model village to receive about Rs 1 crore for development
  • Solar cities program includes Modhera (Gujarat) and Konark (Odisha), with more in pipeline

Challenges include:

    • Lack of funding for long-term maintenance
    • Unclear plans for operations after warranty periods
    • Some past projects failed due to inadequate repair and maintenance
    • Need for clarity on Operations and Maintenance (O&M) funding

More Related Articles

ONGC Bhatiapar Blowout

The ONGC Bhatiapar blowout in Assam’s Sivasagar district has raised urgent concerns about the safety and preparedness of India’s oil and gas industry. This gas leak, ongoing since

Wind Energy in Karnataka

In the financial year 2024-25, wind energy in Karnataka witnessed historic growth. The state added 1,331.48 MW of wind power capacity — one of the highest in the country. This feat was c

Tamil Nadu NSAP Contribution

In the latest public discourse, the Tamil Nadu NSAP contribution has become a significant topic. Tamil Nadu has showcased exceptional leadership in social welfare funding, often surpassing the

Dibang Valley Project in Arunachal

The Forest Advisory Committee (FAC) under the Ministry of Environment, Forest and Climate Change (MoEFCC) has granted in-principle forest clearance for the Etalin Hydropower Project, one of India&

Bihar Sex Ratio 2022

The Bihar sex ratio 2022 has become a topic of national concern, especially for students preparing for competitive exams like SSC, UPSC, and State PCS. According to the Vital Statistics of Indi

Cotton Cultivation in Punjab 2025

 Punjab is making headlines in 2025, not for its usual paddy fields, but for a big leap in cotton cultivation.  The state has recorded a 20% increase in cotton cultivation in Punjab 2

NCR Road Connectivity Projects

The Centre has approved three major NCR road connectivity projects worth Rs 14,850 crore to improve travel in the National Capital Region (NCR). These projects aim to reduce commute times for D

Ladakh Reservation 2025

In a major step towards empowering local communities, President Droupadi Murmu has enacted the Ladakh Reservation 2025, ensuring 85% job reservation in public employment for residents of the Union

Katra to Srinagar Vande Bharat Train

The Katra to Srinagar Vande Bharat train is all set to begin its commercial operations on June 7, 2025, marking a historic milestone for railway connectivity in Jammu and Kashmir. Inaugurated b

Delhi Air Pollution Plan 2025

Delhi continues to contend with alarming levels of air pollution annually, particularly during the winter months. In response to this ongoing crisis, Delhi Chief Minister Rekha Gupta recently l

Toppers

anil kumar
Akshay kuamr
geeta kumari
shubham